Labels

Showing posts with label Redcliff area. Show all posts
Showing posts with label Redcliff area. Show all posts

Tuesday, April 12, 2011

Imperial Oil to divest certain Alberta assets

Imperial Oil Resources has initiated a process to divest certain of its assets in the Medicine Hat area (Redcliff-Schuler) in Alberta, and has retained Scotia Waterous as its exclusive financial advisor to assist in this process. The Redcliff-Schuler offering represents an opportunity to buy conventional, long-life shallow gas production.



Offering Highlights:
Redcliff area overview:
-- 88% working interest in the Redcliff producing assets
-- Raw production of 3.2 MMcf/d as of January 2011; 100% of production is operated
-- Partners include Enerplus, ConcoPhillips Canada Energy Partnership and the City of Medicine Hat Gas Department
-- Main producing formations include the Cretaceous Medicine Hat and Second White Speckled Shale (shallow depth of ~600 mKB)
-- Potential to capture incremental gas with low cost infill drilling locations
-- Majority of Redcliff leases are developed with 4 to 6 wells/section; Nearby operators (Cenovus and Direct Energy) have drilled up to 16 wells/section
-- Imperial Oil has extensive infrastructure in the area; Operated with a 100% ownership in two compressors; Gas does not require processing beyond dehydration and compression; Custody transfer at the compressors.

Schuler area overview:
-- 100% working interest in the Schuler Medicine Hat Gas Unit
-- Raw production of 2.7 MMcf/d as of January 2011; 100% of production is operated
-- Unitized formation - Cretaceous Medicine Hat (shallow depth of ~ 600 mKB)
-- Includes interests in non-unitized formations on a portion of the lands
-- Potential to capture incremental gas with low cost infill drilling locations
-- Majority of Schuler leases are developed with 4 to 6 wells/section; No Unit drilling activity since 2007
-- Offset operators (Direct Energy, Enerplus and Nexen) have drilled up to 16 wells/section; Extensive infill drilling by other operators in the area in 2008-2009
-- Production is pipelined to Direct Energy’s compressor and dehydrator at 13-07-016- 01W4; Custody transfer meter upstream from the compressor

LinkWithin

Related Posts Plugin for WordPress, Blogger...